Resolved issues with existing systems and replaced malfunctioning parts.
Installed new electrical components, fixtures and motors.
Used hand tools such as wire strippers, cutters to prepare wires for connections to boxes, terminals.
Planned layout and installation of wiring and fixtures based on project specifications and building codes.
Electrician
JAC Electric
Edison
11.2022 - 12.2024
Conduct thorough circuit inspections, adeptly troubleshoot, and resolve issues for optimal functionality
Install and maintain electrical wiring systems to ensure safe and reliable operations
Interpret blueprints to guarantee precise system installations and adherence to project specifications
Instrumentation & Electrical Technician
Passaic Valley Sewerage
Newark
10.2018 - 12.2024
Calibrate, monitor, troubleshoot, maintain and document all field instruments such as transmitters, controllers, valves, PLC's, HMI's, CEMS, plant safety systems, PH, ORP, and Conductivity Meters
Design and assemble complex circuit boards for electrical applications, ensuring optimal functionality and reliability
Read and interpret electrical schematics to guarantee precise system installation
Line Operation Worker
Passaic Valley Sewerage
Newark
07.2017 - 10.2018
Assisted in the operation of large-scale water waste treatment and collection systems to ensure efficient and environmentally responsible processes
Contributed to the troubleshooting efforts for collection systems, aiding in the swift resolution of issues to maintain system functionality
Electrical/Construction Lead, Equipment Operator, Maintenance Technician, Electrical Apprentice at JoMar High VoltageElectrical/Construction Lead, Equipment Operator, Maintenance Technician, Electrical Apprentice at JoMar High Voltage