Accomplished Boilermaker Superintendent with a proven track record at JJ White, adept in blueprint reading and contractor management. Excelled in leading high-stakes projects, enhancing client relationships, and executing multi-project coordination with precision. Demonstrated exceptional decision-making and risk management, ensuring project completion with efficiency and safety.
.Managed and oversaw construction of a New Tickle Catalyst Unit .
.Managed Iron workers (Shamrock steel)
Millwrights JJwhite)
Boilermakers (JJwhite) coordinated with pipefitters (jjwhite)
.Managed Cranes with Bay Crane of New York for the Rigging and Lifts of 5, 120' tray towers , Various sized heat exchangers drums and pumps
Bid future Turnaround of existing Tickle Unit to be completed after new unit is up and running , this consisted of package boiler removal and installation of new boiler , 12 stainless 12" nozzles and various drums towers and heater inspections and repairs
Monroe Energy 2018
.Managed FCC Turnaround Oversaw the entire FCC .
this T/A consisted of the removal & reinstallation of regenerator cyclones , Re tubing of the floor and roof tubes in the firebox , open tunnel and repair of 10 towers , removal and reinstallation of Reactor air grid , removal and installation of FCC overhead ductwork.
.Managed all Boilermaker work and provided daily updates to Monroe energy to stay within the P6 schedule .
.Bid extra work of 4 expansion joints
Worked with engineers for the removal and install of a 22'x10' drums that was trapped within the structure
.2017 Bayonne Energy, D boiler re tube
.Managed Boilermakers of the removal and reinstallation of Furnace tubes , established cut lines, rigging plans and reinstall of furnace tubes
.Managed the cleaning of the generator bank tubes.
.Managed all Q/C Holds and paperwork
.Worked with client on as how to get more efficiency from the Boiler if we were to clean buildup of the generation bank tubes which were severely clogged .
We did this successfully by way of a 10k pump with worm drive lancing equipment
.2019 2020ConocoPhillips Wood River Refinery illinois
Boiler 19 Rebuild .
Managed Boiler 19 rebuild
Worked with client , engineers , coordinators and Fabricators on rebuild .
Boiler 19 is a D Boiler which was pre fabricated off site , Boiler 19 developed linear cracks in the Mud drum ,
Managed fabrication of new Mud drum with Contential Fab off site .
Worked with engineers as how to support the Steam drum during tube removal, all tubes were removed and replaced without issue .
Managed all rigging plans and crane support
Worked with client on schedule of tube bends from Cleaver Brooks Boiler
Managed Erection of new filterhouse design with Client ,Braden Steel and Engineers