Accomplished Boilermaker Superintendent with a proven track record at JJ White, adept in blueprint reading and contractor management. Excelled in leading high-stakes projects, enhancing client relationships, and executing multi-project coordination with precision. Demonstrated exceptional decision-making and risk management, ensuring project completion with efficiency and safety.

Overview

3
3
years of professional experience

Work History

Boilermaker Superintendent

JJ White
Jan - 03.2022
  • March 2022 ,
  • Managed Shell Sewaren Turnarounds twice a year from 2017 to march of 2022 .
  • Worked with clients to come up with the best course of action as to having Turnarounds completed in a timely safe manner .
  • coordinated equipment , tools manpower , payroll, safety, managed Turnaround with client (Shell) , crane company (AmQuip) Pipefitters (FM,Slyvan)
  • JJ White (Boilermakers) scaffold builders (Brand)
  • this turnaround consist of the removal, cleaning ,reinstallation of 12 Heat Exchangers
  • 2 tray towers , remove , clean , replace , hydro
  • 1 Boiler , open , boiler inspection , discovery , repair damaged tubes , hydro , close .
  • was also in charge of all documents for Hydrostatic test which is than turned over to the client
  • 2018-2019
  • lyondell Basell Edision NJ 2019

.Managed and oversaw construction of a New Tickle Catalyst Unit .

.Managed Iron workers (Shamrock steel)

Millwrights JJwhite)

Boilermakers (JJwhite) coordinated with pipefitters (jjwhite)

.Managed Cranes with Bay Crane of New York for the Rigging and Lifts of 5, 120' tray towers , Various sized heat exchangers drums and pumps

Bid future Turnaround of existing Tickle Unit to be completed after new unit is up and running , this consisted of package boiler removal and installation of new boiler , 12 stainless 12" nozzles and various drums towers and heater inspections and repairs

Monroe Energy 2018

.Managed FCC Turnaround Oversaw the entire FCC .

this T/A consisted of the removal & reinstallation of regenerator cyclones , Re tubing of the floor and roof tubes in the firebox , open tunnel and repair of 10 towers , removal and reinstallation of Reactor air grid , removal and installation of FCC overhead ductwork.

.Managed all Boilermaker work and provided daily updates to Monroe energy to stay within the P6 schedule .

.Bid extra work of 4 expansion joints

Worked with engineers for the removal and install of a 22'x10' drums that was trapped within the structure

.2017 Bayonne Energy, D boiler re tube

.Managed Boilermakers of the removal and reinstallation of Furnace tubes , established cut lines, rigging plans and reinstall of furnace tubes

.Managed the cleaning of the generator bank tubes.

.Managed all Q/C Holds and paperwork

.Worked with client on as how to get more efficiency from the Boiler if we were to clean buildup of the generation bank tubes which were severely clogged .

We did this successfully by way of a 10k pump with worm drive lancing equipment

.2019 2020ConocoPhillips Wood River Refinery illinois

Boiler 19 Rebuild .

Managed Boiler 19 rebuild

Worked with client , engineers , coordinators and Fabricators on rebuild .

Boiler 19 is a D Boiler which was pre fabricated off site , Boiler 19 developed linear cracks in the Mud drum ,

Managed fabrication of new Mud drum with Contential Fab off site .

Worked with engineers as how to support the Steam drum during tube removal, all tubes were removed and replaced without issue .

Managed all rigging plans and crane support

Worked with client on schedule of tube bends from Cleaver Brooks Boiler

Boilermaker Supervisor

Riggs Distler
Oct - 01.2022
  • Carneys Point Energy Stations Fall 2022 SDA/SCR rebuild
  • Cordinated job steps between Hake Group and Riggs Distler
  • Followed safety procedures and protocols to minimize work related injuries
  • Identified issues and brought to attention of foreman.
  • Evaluated plans and inspected ongoing construction to keep work in line with project goals.
  • Managed Boilermaker welders as how to operate Flux Core Mig Welding Methods
  • Created a Mig Weld Tech so the welders would always have a fully operational Mig welder at all times .
  • West Deptford energy Center 2014 thru 2021,
  • Spring & Fall Outages
  • Managed Boilermakers
  • Worked Filterhouse, removal of filters and installation
  • Managed tube repairs
  • managed inlet duct liner plate repairs and baffles
  • Managed Schedule with client .
  • west deptford energy 2020
  • units 1 & 2 stack damper repairs
  • Managed Stack Damper repairs with client and Damper fabricator
  • Managed plan as to how to repair damper without it falling into the stack ...
  • fabricated new damper stiffeners so that the damper blades wouldn't fail again .
  • managed scaffold builders and Boilermakers

Boilermaker Supervisor

Skanska Construction
05.2014 - 11.2015
  • Newark Hess Energy center 2014-2015
  • Managed stack Fabrication and Erection
  • Worked with client on a plan to install (2) 265' Hrsg stacks
  • Managed CBI Boilermakers Stack fabrication and Skanska Engineers on the stacks erection .
  • Managed filter house erection

Boilermaker Supervisor

Azco Constructors
01.2013 - 03.2014
  • West Deptford energy center HRSG Erection 2013 2014
  • Managed HRSG 1&2 Erection
  • Erected Boilers 1&2 , coordinated with Azco and LG constructors
  • Set all Tube Modules , Outer casing Walls Roof Floors and catalyst baskets
  • Cordinated between pipefitters , ironworkers ,millwrights engineers and Sub contractors, ive worked this HRSG from top to bottom from erection to outages with Azco and Riggs distler
  • 2016 West Deptford Energy Center
  • Filterhouse removal ,units 1&2
  • Managed removal of Filterhouse Hoods with Client ,Braden steel,

Managed Erection of new filterhouse design with Client ,Braden Steel and Engineers

Education

High School Diploma -

Gateway Regional High School
Woodbury Heights, NJ
06.1985

Skills

  • Client Relationships throughout industry
  • Decision Making
  • Blueprint Reading
  • Contractor Management
  • Blueprint and Schematic Understanding
  • Multi-Project Coordination
  • Materials Estimation
  • Procedure Planning
  • Dependable and Hardworking
  • Risk Management
  • Employee Training

Timeline

Boilermaker Supervisor

Skanska Construction
05.2014 - 11.2015

Boilermaker Supervisor

Azco Constructors
01.2013 - 03.2014

Boilermaker Superintendent

JJ White
Jan - 03.2022

Boilermaker Supervisor

Riggs Distler
Oct - 01.2022

High School Diploma -

Gateway Regional High School