Painter
Miguel Cegarra
Las Marias
10.2024 - 03.2025
- Applied primers and sealers to prepare new surfaces for painting.
- Prepared surfaces by washing, scraping, sanding, and patching holes.
- Repaired cracks in drywall prior to painting or wallpapering rooms.
- Sanded woodwork prior to staining or painting.
- Estimated cost of materials needed for the project.
- Followed the manufacturer's instructions when mixing chemicals for special applications.
- Applied paint with brushes, rollers, spray guns, or other equipment.
- Inspected painted surfaces for defects such as cracking, blistering, or fading.
- Cleaned up job sites after completion of projects.
- Assessed work areas to determine safety measures required before beginning the job.
- Used ladders and scaffolds to reach high walls and ceilings.
- Cleaned and properly stored paint equipment and supplies at end of each workday.
